While you probably weren’t looking, the city of Indianapolis increased total multiuse trail mileage by a little under two miles with a project on the near northside connected to the city’s newest park and one build in one of the city’s oldest parks.
Reverend C. R. Williams Park
Click for larger image |
Click for larger image |
Riverside Promenade
On the west side, the city cut the ribbon in October on about 1-1/3 miles of the Riverside Promenade, which runs along the west side of East Riverside Drive from 16th Street north before curving to follow 29th Street to the White River bridge (and, presumably, the White River-Wapahani Trail). The broad asphalt strip is punctuated at intervals by patterns painted on its surface and “nodes” with rest stops and interpretive signage. Trail users can access the Burdsall Parkway bike lanes and (sometimes) facilities at the recreation center.
Capital Avenue Bike Lane
On a similar topic, DPW continues to build a buffered bike lane along Capital from Fall Creek to 18th Street. The existing “dirty bike stripe” on the west edge of the street will be decommissioned and bikes will have a protected path on the east side. It isn’t striped yet, but appears to wide enough for a bidirectional lane similar to that on Illinois south of 18th. At the same time, a bike lane from the Monon to Capital along 22nd is taking shape, but the last blocks won’t be finished any time soon due to a giant hole created by every Indy resident’s favorite traffic hazard, DigIndy. Speaking of which, the detour on the Fall Creek Greenway trail between 32nd and 34th has been closed and the trail now follows its mapped route again. One has to wonder why, in a project that cost more than two billion dollars, the city couldn’t find an extra $25K to put some restrooms in that space. |
Watch this space for more updates as the gummint infrastructure cash trickles down to reshape our streets…
copyright © 2023 scmrak
No comments:
Post a Comment